top of page
NORTH EAST SEPTIC & EXCAVATING
Septic tank dig prepped
Vacuum testing new concrete tank
New septic field
Load of sand
Truck pulling out after dumping C-33 sand
Laying out an advanced septic field system
Taking down tall trees for land clearing
Laterals in progress for new septic bed
Complicated distribution piping for D-box from tank
Fabric over septic, ready for backfill
New poly infiltrator tank on a mountain where truck couldn't get to
Sewer line on bed of compacted DGA in rocky area
Completion of sand bed for septic to a huge 6 bedroom house
Septic laterals set in stone
Brand new concrete septic tank just dropped in
Getting ready to set a massive poly tank on the side of a mountain
Big boulder wall started
Boulder wall second stage, each boulder here is about 2-3 tons
High pressure septic laterals for a pump system
Specialty knuckle boom truck setting a 14,000 pound concrete tank
Road mats are set to prevent ruts in grass and minimize clean up work
Finishing septic field with high water table
Bed with stone
Sand bed ready for inspection, stone and pipe
Dropping in a new poly tank
bottom of page